Mansfield City Council Moves to Approve 34 New Gas Wells and Compressor Station Even While Mulling New Ordinance

flipflop111Pending Permit for an 18% Increase in City’s Well Count Wasn’t Disclosed to Citizens or Media at Special December 3rd Workshop on Gas Regulations

What: Mansfield City Council to Consider Large new Gas Facility Permit, including New Compressor Station on Debbie Lane

When: Monday Night, January 12th 7 pm

Where: Mansfield City Hall, 1200 East Broad Street 

Mansfield’s city council is scheduled to move forward tonight with a second hearing on a request from  Edge Resources to build 34 additional gas wells and a new compressor station despite a pledge by the council in December to  consider new ordinances designed to be more protective of public health, a process that is still ongoing and that concerned residents hope will reduce hazards posed by  drilling within the city.

Although City Hall had been working with Edge Resources for months on a renewal of its expired 2008 Special Use Permit that would raise the city’s well count by 18%, the Mansfield City Council and staff didn’t disclose that information to residents or the media when it convened a special workshop to discuss a new gas drilling ordinance on December 3rd.

It was very disappointing to know that while we were beginning good faith discussions on new ordinances with the Council, it had already made a decision to grant a second hearing to renew an expired permit that will significantly add to the number of wells and allows yet another compressor within city limits,” said Tamera Bounds, a Co-chair of of local citizen advocacy group, Mansfield Gas Well Awareness (MGWA).

City officials say they have no choice but to OK the renewal because the original SUP was filed before the city passed its current gas ordinance. But Bounds and others say the timing of council approval, and lack of transparency to the public about the permit makes the effort premature.

“Even if their hands are tied, they could wait until any revisions of the ordinance are in place and incorporate those changes into the Edge permit.” She specifically listed baseline air testing, vapor recovery, “flowback” control, and infrared camera monitoring as state-of-the-art features that every new gas facility permit should include.

Edge’s proposed permit calls for thirty-four additional wells to be drilled within 350 feet of homes near Debbie Lane with a new compressor and frack pond also constructed at the same site, where there are already two wells. Mansfield Gas Well Awareness is pushing for new ordinances with setbacks of at least 1500 feet between gas wells, compressors and homes.

Others were less circumspect in their criticism of what they called the council’s duplicity in dealing with residents. “It’s outrageous this pending permit wasn’t disclosed at the December 3rd council meeting called specifically to talk about how to regulate old and new gas facilities in Mansfield,” said Jim Schermbeck, Director of Downwinders at Risk, the local clean air group working with MGWA to change the city’s ordinance. “Even while City Hall representatives were talking about a dialogue with citizens to consider new regulations, they deliberately withheld notice about a huge new increase in gas drilling being requested.” He also called for a delay in council action on the permit until after a new ordinance was passed.

Leave a Comment





This site uses Akismet to reduce spam. Learn how your comment data is processed.